Project Features | ||
---|---|---|
Project | MANUFACTURING OF OPTIC FIBRE CABLES | |
Capacity per Annum | 1. 3.5 Million CKM of jelly filled cable 2. 1.0 Million heat shrinkable jointing kits 3. 3.0 Lakh CKM of optical fibres |
|
Land Requirements | 2900 Sq. M | |
Building Requirements | 1800 Sq. M | |
Plant & Machinery and Test Equipment |
Optical fibre drawing tower equipment, other line equipments, etc. |
|
Electrical Installation | 500 KW | |
Implementation Period | 4 Months | |
Manpower Required |
170 | |
Raw Materials / Equipment Required | Optic fibre, Nylon, Polyethylene, etc | |
Total Project Cost | USD 5.00 Million | |
Expected Annual Sales | USD 9.00 Million | |
Profitability |
20 % | |
Form of Offer |
1. Joint venture 2. Turnkey project |